A platform for research: civil engineering, architecture and urbanism
Arc-welded factory building
First American 100% arc-welded steel-frame building, new $1, 000,000 tank shop, Building No. 14, at Pittsfield, Mass, works of General Electric Co; pilasters covered with plates; all-steel framework erected during subzero weather; crane-girder diaphragm and impost connections to exterior column. (See also Gen Bldg Contractor v 3 n 2 Feb 1932 p 7-10)
Arc-welded factory building
First American 100% arc-welded steel-frame building, new $1, 000,000 tank shop, Building No. 14, at Pittsfield, Mass, works of General Electric Co; pilasters covered with plates; all-steel framework erected during subzero weather; crane-girder diaphragm and impost connections to exterior column. (See also Gen Bldg Contractor v 3 n 2 Feb 1932 p 7-10)
Arc-welded factory building
Constructor
Constructor ; 14
1932
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Arc-welded factory building in Canada
Engineering Index Backfile | 1931