A platform for research: civil engineering, architecture and urbanism
New lambeth bridge
Bridge replaces old wire-rope suspension bridge over Thames River; has total length of 776 ft and consists of 5 spans; deck has 36-ft roadway and two 12-ft pathways; central span measures 165 ft and is flanked on each side by span of 149 ft and one of 125 ft; each is composed of nine steel arched ribs; erection was carried out by means of 20-t cranes set up on piers and abutments. (See also Engineer v 153 n 3987 June 10 1932 p 630-2; Eng News Rec v 108 n 13 Mar 31 1932 p 480-1)
New lambeth bridge
Bridge replaces old wire-rope suspension bridge over Thames River; has total length of 776 ft and consists of 5 spans; deck has 36-ft roadway and two 12-ft pathways; central span measures 165 ft and is flanked on each side by span of 149 ft and one of 125 ft; each is composed of nine steel arched ribs; erection was carried out by means of 20-t cranes set up on piers and abutments. (See also Engineer v 153 n 3987 June 10 1932 p 630-2; Eng News Rec v 108 n 13 Mar 31 1932 p 480-1)
New lambeth bridge
Engineering
Engineering ; 134
1932
3 pages
1 Supp plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1932