A platform for research: civil engineering, architecture and urbanism
Removal of old suspension bridge and construction of new steel-arch bridge consisting of five spans, 125 ft to 155 ft in length, having total length of 776 ft; sinking of steel caissons for pier foundations; excavation procedure; total cost of bridge and approaches, 936,365 British pounds.
Removal of old suspension bridge and construction of new steel-arch bridge consisting of five spans, 125 ft to 155 ft in length, having total length of 776 ft; sinking of steel caissons for pier foundations; excavation procedure; total cost of bridge and approaches, 936,365 British pounds.
Lambeth bridge
Instn Civ Engrs -- Min Proc
Groves, G.L. (author)
1935
27 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1932
Engineering Index Backfile | 1932