A platform for research: civil engineering, architecture and urbanism
Soft ground complicates dry-dock construction
Account of changes made necessary in construction of graving dock being built at Philadelphia Navy Yard by appearances of water-bearing strata which were not indicated in preliminary borings.
Soft ground complicates dry-dock construction
Account of changes made necessary in construction of graving dock being built at Philadelphia Navy Yard by appearances of water-bearing strata which were not indicated in preliminary borings.
Soft ground complicates dry-dock construction
Eng. News-Rec
Lee, Charles A. (author)
1920
5 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Faulted foundation complicates construction of Folsom dam
Engineering Index Backfile | 1954
|Underground water supply complicates bridge pier construction
Engineering Index Backfile | 1942
|British Library Online Contents | 1997
|Toxic Gas Complicates Train Crash Rescue
British Library Online Contents | 1996
Engineering Index Backfile | 1963