Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Soft ground complicates dry-dock construction
Account of changes made necessary in construction of graving dock being built at Philadelphia Navy Yard by appearances of water-bearing strata which were not indicated in preliminary borings.
Soft ground complicates dry-dock construction
Account of changes made necessary in construction of graving dock being built at Philadelphia Navy Yard by appearances of water-bearing strata which were not indicated in preliminary borings.
Soft ground complicates dry-dock construction
Eng. News-Rec
Lee, Charles A. (Autor:in)
1920
5 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground water supply complicates bridge pier construction
Engineering Index Backfile | 1942
|Faulted foundation complicates construction of Folsom dam
Engineering Index Backfile | 1954
|British Library Online Contents | 1997
|Toxic Gas Complicates Train Crash Rescue
British Library Online Contents | 1996
Engineering Index Backfile | 1963