A platform for research: civil engineering, architecture and urbanism
Particular characteristics of Stuttgart location, such as its relatively small area enclosed in narrow valley basin which create special traffic problems are pointed out; it was decided, therefore, to construct underground tramway system in entire city center, about 10 ml long, with 21 stops; so-called "extended Berlin construction method" is applied in works which started in 1962.
Particular characteristics of Stuttgart location, such as its relatively small area enclosed in narrow valley basin which create special traffic problems are pointed out; it was decided, therefore, to construct underground tramway system in entire city center, about 10 ml long, with 21 stops; so-called "extended Berlin construction method" is applied in works which started in 1962.
Underground tramway construction in Stuttgart
U-Strassenbahnbau in Stuttgart
Heeb, A. (author)
1965
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete in tramway track construction
Engineering Index Backfile | 1911
Dossier: Tramway - << Un projet de tramway est d'abord une vision politique >>
Online Contents | 2000
|