Construction method of structures on tramway catenary
The present invention relates to a construction method for constructing a large structure without dismantling a catenary. To this end, a method of constructing a structure on a railway track (100) includes the steps of installing an abutment or pier (110) and a temporary bent (200) near the track (100) (S100); assembling structure blocks (310) in a structure assembly site (300) (S110); sequentially or simultaneously executing a step of installing a first temporary track (320) in the structure assembly site (300) and a step of installing a second temporary track (420) in an installation site (90) (S120); transversely moving the structure blocks (310) on the first temporary track (320) by a transverse trolley (400) (S130); transporting the structure blocks (310) on the railway track (100) by a trolley (150) and a structure moving device (80) (S140); transversely moving the structure blocks (310) on the second temporary track (420) by the transverse trolley (400) (S150); raising the structure blocks (310) by a lifting device and installing the same on the abutment or pier (110) or the temporary bent (200) (S160); and connecting the structure blocks (310) and dismantling the temporary bent (200) (S170).
본 발명은 전차선 선로 위의 구조물 시공방법에 관한 것으로, 보다 상세하게는 전차선의 해체없이 대형 구조물을 시공할 수 있는 시공방법에 관한 것이다. 이를 위해, 전차선(10)이 설치된 선로(100) 위에 구조물을 시공하는 방법에 있어서, 선로(100) 인근에 교대 또는 교각(110) 및 가설벤트(200)를 설치하는 단계(S100); 구조물의 설치현장(90)으로부터 이격된 구조물조립장(300)에서 구조물 블럭(310)을 조립하는 단계(S110); 구조물조립장(300)에서 선로(100)를 가로지르는 제 1 임시궤도(320)를 설치하는 단계와 설치현장(90)에서 선로(100)를 가로지르는 제 2 임시궤도(420)를 설치하는 단계가 순차적으로 또는 동시에 실행되는 단계(S120); 구조물 블럭(310)이 횡트롤리(400)에 의해 제 1 임시궤도(320) 상에서 횡이동하는 단계(S130); 선로(100) 상에서 트롤리(150)와 구조물 이동장치(80)에 의해 구조물 블럭(310)이 운반되는 단계(S140); 구조물 블럭(310)이 횡트롤리(400)에 의해 제 2 임시궤도(420) 상에서 횡이동하는 단계(S150); 인양장비로 구조물 블럭(310)을 인상하여 교대 또는 교각(110) 또는 가설벤트(200) 상에 설치하는 단계(S160); 및 구조물 블럭(310)을 연결하고 가설벤트(200)를 해체하는 단계(S170);를 포함하는 것을 특징으로 하는 전차선 선로 위의 구조물 시공방법이 제공된다.
Construction method of structures on tramway catenary
The present invention relates to a construction method for constructing a large structure without dismantling a catenary. To this end, a method of constructing a structure on a railway track (100) includes the steps of installing an abutment or pier (110) and a temporary bent (200) near the track (100) (S100); assembling structure blocks (310) in a structure assembly site (300) (S110); sequentially or simultaneously executing a step of installing a first temporary track (320) in the structure assembly site (300) and a step of installing a second temporary track (420) in an installation site (90) (S120); transversely moving the structure blocks (310) on the first temporary track (320) by a transverse trolley (400) (S130); transporting the structure blocks (310) on the railway track (100) by a trolley (150) and a structure moving device (80) (S140); transversely moving the structure blocks (310) on the second temporary track (420) by the transverse trolley (400) (S150); raising the structure blocks (310) by a lifting device and installing the same on the abutment or pier (110) or the temporary bent (200) (S160); and connecting the structure blocks (310) and dismantling the temporary bent (200) (S170).
본 발명은 전차선 선로 위의 구조물 시공방법에 관한 것으로, 보다 상세하게는 전차선의 해체없이 대형 구조물을 시공할 수 있는 시공방법에 관한 것이다. 이를 위해, 전차선(10)이 설치된 선로(100) 위에 구조물을 시공하는 방법에 있어서, 선로(100) 인근에 교대 또는 교각(110) 및 가설벤트(200)를 설치하는 단계(S100); 구조물의 설치현장(90)으로부터 이격된 구조물조립장(300)에서 구조물 블럭(310)을 조립하는 단계(S110); 구조물조립장(300)에서 선로(100)를 가로지르는 제 1 임시궤도(320)를 설치하는 단계와 설치현장(90)에서 선로(100)를 가로지르는 제 2 임시궤도(420)를 설치하는 단계가 순차적으로 또는 동시에 실행되는 단계(S120); 구조물 블럭(310)이 횡트롤리(400)에 의해 제 1 임시궤도(320) 상에서 횡이동하는 단계(S130); 선로(100) 상에서 트롤리(150)와 구조물 이동장치(80)에 의해 구조물 블럭(310)이 운반되는 단계(S140); 구조물 블럭(310)이 횡트롤리(400)에 의해 제 2 임시궤도(420) 상에서 횡이동하는 단계(S150); 인양장비로 구조물 블럭(310)을 인상하여 교대 또는 교각(110) 또는 가설벤트(200) 상에 설치하는 단계(S160); 및 구조물 블럭(310)을 연결하고 가설벤트(200)를 해체하는 단계(S170);를 포함하는 것을 특징으로 하는 전차선 선로 위의 구조물 시공방법이 제공된다.
Construction method of structures on tramway catenary
전차선 선로 위의 구조물 시공방법
KIM JUNG HYUN (author) / CHOE IN KI (author)
2021-07-12
Patent
Electronic Resource
Korean