A platform for research: civil engineering, architecture and urbanism
Sewer construction practice at Memphis
Procedure in building 15-mi sewer; horizontal timber shoring used; crossings under highways and railroad tracks built within timber lined tunnels excavated without shields; siphons built on concrete mats in form of dual sewers; manholes with precast concrete steps and special covers designed to save critical materials. (See also Eng News-Rec v 132 n 18 May 4 1944 p 671-4)
Sewer construction practice at Memphis
Procedure in building 15-mi sewer; horizontal timber shoring used; crossings under highways and railroad tracks built within timber lined tunnels excavated without shields; siphons built on concrete mats in form of dual sewers; manholes with precast concrete steps and special covers designed to save critical materials. (See also Eng News-Rec v 132 n 18 May 4 1944 p 671-4)
Sewer construction practice at Memphis
Concrete Constr Eng
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer construction practice at Memphis
Engineering Index Backfile | 1944
Engineering Index Backfile | 1907
Good practice in sewer construction
Engineering Index Backfile | 1957
|Municipal practice in sewer construction Medford, Mass.
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1892