A platform for research: civil engineering, architecture and urbanism
Sewer construction practice at Memphis
Procedure in building 15-mi sewer; horizontal timber shoring used; crossings under highways and railroad tracks built within timber lined tunnels excavated without shields; siphons built on concrete mats in form of dual sewers; manholes with precast concrete steps and special covers designed to save critical materials. (see also Concrete and Constr Eng v 39 n 11 Nov 1944 p 286-8)
Sewer construction practice at Memphis
Procedure in building 15-mi sewer; horizontal timber shoring used; crossings under highways and railroad tracks built within timber lined tunnels excavated without shields; siphons built on concrete mats in form of dual sewers; manholes with precast concrete steps and special covers designed to save critical materials. (see also Concrete and Constr Eng v 39 n 11 Nov 1944 p 286-8)
Sewer construction practice at Memphis
Eng News-Rec
Engineering News-Record ; 132
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer construction practice at Memphis
Engineering Index Backfile | 1944
Engineering Index Backfile | 1907
Good practice in sewer construction
Engineering Index Backfile | 1957
|Municipal practice in sewer construction Medford, Mass.
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1892