A platform for research: civil engineering, architecture and urbanism
Six construction design factors of sewer line; depth of fill over top of sewer; width of trench at top of sewer pipe; type of bedding; laying, jointing and finishing; back filling; and safety and inspection; formulas and procedures for solving typical construction problems.
Six construction design factors of sewer line; depth of fill over top of sewer; width of trench at top of sewer pipe; type of bedding; laying, jointing and finishing; back filling; and safety and inspection; formulas and procedures for solving typical construction problems.
Good practice in sewer construction
Pub Works
Borland, S. (author)
Public Works ; 88
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Good practice in backfilling sewer trenches
Engineering Index Backfile | 1949
Sewer construction practice at Memphis
Engineering Index Backfile | 1944
Sewer construction practice at Memphis
Engineering Index Backfile | 1944
Municipal practice in sewer construction Medford, Mass.
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1938