A platform for research: civil engineering, architecture and urbanism
Solving boom town San Diego's sewage problem
Article describes how 11.5 mi of interceptor sewer was laid in difficult ground and through tunnels, and treatment plant constructed reaching 24 ft below sea level, to provide for 125% increase in population.
Solving boom town San Diego's sewage problem
Article describes how 11.5 mi of interceptor sewer was laid in difficult ground and through tunnels, and treatment plant constructed reaching 24 ft below sea level, to provide for 125% increase in population.
Solving boom town San Diego's sewage problem
Pub Works
Phelps, B.D. (author)
Public Works ; 74
1943
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
San Diego's double-barreled aqueduct
Engineering Index Backfile | 1953
|San Diego's double-barreled aqueduct
Engineering Index Backfile | 1953
|San Diego's Accident Prevention Program
Wiley | 1949
|San Diego's Experience With RPM Pipe
Wiley | 1972
|San Diego's Sewer Condition Assessment Program
ASCE | 2004
|