A platform for research: civil engineering, architecture and urbanism
Techniques and equipment used in construction of rockfill for West Virginia flood control project; Summersville dam has bottom width in direction of stream flow of about 1800 ft, crest width of about 40 ft, maximum height of 388 ft from valley floor, and crest length of 2280 ft; when completed dam will create reservoir that covers more than 7 sq mi of area; sloping 29-ft diam steel lined tunnel is now serving as bypass for river water around dam foundation work.
Techniques and equipment used in construction of rockfill for West Virginia flood control project; Summersville dam has bottom width in direction of stream flow of about 1800 ft, crest width of about 40 ft, maximum height of 388 ft from valley floor, and crest length of 2280 ft; when completed dam will create reservoir that covers more than 7 sq mi of area; sloping 29-ft diam steel lined tunnel is now serving as bypass for river water around dam foundation work.
Tough spot for big machines
Excavating Engr
Halmos, E.E. (author)
Excavating Engineer ; 57
1963
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New Ticket Machines Meet Tough Demand
IuD Bahn | 1996
|Machines conquer tough slope-paving job
Engineering Index Backfile | 1951
Tough pump serves tough applications
British Library Online Contents | 2011
British Library Online Contents | 2001
KITCHENS SPOT - Kitchen tools and machines.
Online Contents | 2008
|