A platform for research: civil engineering, architecture and urbanism
Queenhill bridge over river severn
Description of design and construction of bridge, together with some factors which governed design; bridge has total length of 2466 ft between abutments; there are 27 spans, largest of which measures 237 ft 6 in.; 3 main spans at river are of steel construction, approach spans on either side being of reinforced concrete; almost all foundations are formed of caissons which were sunk to bed of Keuper marlstone. (see also abstract in Surveyor v 122 n 3684 Jan 12 1963 p 46-8)
Queenhill bridge over river severn
Description of design and construction of bridge, together with some factors which governed design; bridge has total length of 2466 ft between abutments; there are 27 spans, largest of which measures 237 ft 6 in.; 3 main spans at river are of steel construction, approach spans on either side being of reinforced concrete; almost all foundations are formed of caissons which were sunk to bed of Keuper marlstone. (see also abstract in Surveyor v 122 n 3684 Jan 12 1963 p 46-8)
Queenhill bridge over river severn
Instn Civ Engrs -- Proc
Gibb, M.E. (author) / Tansley, F.J. (author)
1962
20 pages
8 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Queenhill bridge over river severn
Engineering Index Backfile | 1963
|Engineering Index Backfile | 1946
Engineering Index Backfile | 1965
UB Braunschweig | 1970
|Engineering Index Backfile | 1946