Chute-des-Passes project
Detailed description of project which comprises fully submerged intake structure within existing reservoir; concrete lined 34 ft diam pressure tunnel was completed to intake end, and last rock plug was removed by blasting; 31,000 ft long tunnel ends in five penstocks; five vertical Francis turbines in underground powerhouse each rated at 200,000 hp; drilling, blasting, and excavating work described.
Chute-des-Passes project
Detailed description of project which comprises fully submerged intake structure within existing reservoir; concrete lined 34 ft diam pressure tunnel was completed to intake end, and last rock plug was removed by blasting; 31,000 ft long tunnel ends in five penstocks; five vertical Francis turbines in underground powerhouse each rated at 200,000 hp; drilling, blasting, and excavating work described.
Chute-des-Passes project
Water Power
Water Power ; 11
1959
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chute-des-Passes gigantic construction project
Engineering Index Backfile | 1959
|Huge power project at Chute-des-Passes
Engineering Index Backfile | 1958
|Chute-des-passes: construction drama
Engineering Index Backfile | 1957
|Planning and construction of chute-des passes hydroelectric power project
Engineering Index Backfile | 1960
|Design studies for chute-des-passes surge-tank system
Engineering Index Backfile | 1962
|