A platform for research: civil engineering, architecture and urbanism
Features of 1100 Mw project including details of 120 m high fill type dam with crest length of 550 m; reservoir will cover area of 1600 sq km and is designed for normal operation within 16 m draw down from maximum pool elevation of 766 m.
Features of 1100 Mw project including details of 120 m high fill type dam with crest length of 550 m; reservoir will cover area of 1600 sq km and is designed for normal operation within 16 m draw down from maximum pool elevation of 766 m.
Furnas hydro-electric development
Water Power
Cotrim, J.R. (author)
Water Power ; 10
1958
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Furnas hydro-electric scheme, Brazil -- Closure of diversion tunnels
Engineering Index Backfile | 1967
|ASCE | 2021
|Furnas, Brazil's hydroelectric power plant
Engineering Index Backfile | 1966
|Engineering Index Backfile | 1960
|Nachrichten: Unter-wegs: Furnas Lake Villas auf den Azoren
Online Contents | 2007
|