A platform for research: civil engineering, architecture and urbanism
Three-lead driver speeds pier work
Speed of construction on concrete pier in Pacific Northwest increased by putting down reinforced concrete piles with triple-lead driving rig, assembled on job; rig that was fitted up for driving was derrick barge 120 ft long and of 32 ft beam.
Three-lead driver speeds pier work
Speed of construction on concrete pier in Pacific Northwest increased by putting down reinforced concrete piles with triple-lead driving rig, assembled on job; rig that was fitted up for driving was derrick barge 120 ft long and of 32 ft beam.
Three-lead driver speeds pier work
Eng News-Rec
Engineering News-Record ; 129
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Laminated decking speeds pier construction
Engineering Index Backfile | 1942
Pier Fixity Speeds Cantilever Construction of Roosevelt Bridge
British Library Conference Proceedings | 1996
|Two-pipe pile jetting rig speeds driving on navy pier job
Engineering Index Backfile | 1942
Two-pipe pile jetting rig speeds driving on navy pier job
Engineering Index Backfile | 1942
Planting bridge-pier work for efficient concreting
Engineering Index Backfile | 1935