A platform for research: civil engineering, architecture and urbanism
A-frames aid erection of 300-ft trusses
Based on experience with 300-ft roof truss spans in other plants, timber A-frames were used for steel erection on recent war factory in highly effective manner; trusses were designed with cantilever overhang to prevent stress transfer; suspended trusses are 172 ft long; close timing on erection schedules simplified handling 12,000 tons of steel.
A-frames aid erection of 300-ft trusses
Based on experience with 300-ft roof truss spans in other plants, timber A-frames were used for steel erection on recent war factory in highly effective manner; trusses were designed with cantilever overhang to prevent stress transfer; suspended trusses are 172 ft long; close timing on erection schedules simplified handling 12,000 tons of steel.
A-frames aid erection of 300-ft trusses
Eng News-Rec
Engineering News-Record ; 129
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fast erection of building trusses
Engineering Index Backfile | 1940
Design, Manufacture and Erection of Timber Trusses
NTIS | 1987
|Erection of new bridge trusses over the Guadalope River
Engineering Index Backfile | 1928
|Erection of Chicago stadium long-span trusses noteworthy job
Engineering Index Backfile | 1929
The erection of the New York hippodrome roof trusses
Engineering Index Backfile | 1905