A platform for research: civil engineering, architecture and urbanism
Glen affric hydro-electric works
Feb n 2 p 41-50: Mullardock dam raises level of water in Loch Mullardoch by 110 ft; reservoir acts as feeder to Benevean dam; both are concrete gravity types; construction joints. Mar n 3 p 81-85: Tunnel cross sections and intake; machine for placing concrete tunnel lining; data on shuttering.
Glen affric hydro-electric works
Feb n 2 p 41-50: Mullardock dam raises level of water in Loch Mullardoch by 110 ft; reservoir acts as feeder to Benevean dam; both are concrete gravity types; construction joints. Mar n 3 p 81-85: Tunnel cross sections and intake; machine for placing concrete tunnel lining; data on shuttering.
Glen affric hydro-electric works
Concrete Constr Eng
1951
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mullardoch-Fasnakyle-affric hydro-electric scheme
Engineering Index Backfile | 1946
Glen Shira hydro-electric project
Engineering Index Backfile | 1956
|Glen Affric scheme of north of Scotland hydro-electric board
Engineering Index Backfile | 1952
Engineering Index Backfile | 1959
Hydro-electric civil engineering works
Engineering Index Backfile | 1949
|