A platform for research: civil engineering, architecture and urbanism
Construction methods employed at dam on Kings River in California. Oct n 10 p 52-4: Single, high speed cableway places 4000 cu yd of concrete daily. Nov n 11 p 70-1: Description of aggregate and batch cooling plant consisting of circulated air, ice and heat exchanger. Dec n 12 p 74-5, 78: Production and delivery of aggregate.
Construction methods employed at dam on Kings River in California. Oct n 10 p 52-4: Single, high speed cableway places 4000 cu yd of concrete daily. Nov n 11 p 70-1: Description of aggregate and batch cooling plant consisting of circulated air, ice and heat exchanger. Dec n 12 p 74-5, 78: Production and delivery of aggregate.
Pine flat dam
Construction Methods Equipment
Wise, L.L. (author)
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stabilization of Landslide above Pine Flat Power Plant - Pine Flat Dam, California
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1951
|Aggregate for concrete at pine flat
Engineering Index Backfile | 1951
Dynamic Properties of Pine Flat Dam
NTIS | 1972
|Seismic Analysis of Pine Flat Concrete Dam
TIBKAT | 2021
|