A platform for research: civil engineering, architecture and urbanism
Volume of mass concrete will be 2,150,000 cu yd requiring 1,600,000 bbl of cement and 4,000,000 tons of aggregates; flow sheet showing aggregate movement from pit to stockpiling; data on material handling equipment.
Volume of mass concrete will be 2,150,000 cu yd requiring 1,600,000 bbl of cement and 4,000,000 tons of aggregates; flow sheet showing aggregate movement from pit to stockpiling; data on material handling equipment.
Aggregates for pine flat dam
Pit Quarry
Utley, H.F. (author)
Pit and Quarry ; 44
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
|Stabilization of Landslide above Pine Flat Power Plant - Pine Flat Dam, California
British Library Conference Proceedings | 2000
|Aggregate for concrete at pine flat
Engineering Index Backfile | 1951
Dynamic Properties of Pine Flat Dam
NTIS | 1972
|Seismic Analysis of Pine Flat Concrete Dam
TIBKAT | 2021
|