A platform for research: civil engineering, architecture and urbanism
8 m wide road bridge, destroyed during war, included two three-hinge reinforced concrete arches of 70 m span each; new bridge is of same type; scaffold supporting forms for placing concrete consisted of steel tubes. (See also - n 5 May 1950 p 141-7)
8 m wide road bridge, destroyed during war, included two three-hinge reinforced concrete arches of 70 m span each; new bridge is of same type; scaffold supporting forms for placing concrete consisted of steel tubes. (See also - n 5 May 1950 p 141-7)
Reconstruction of arch bridge over Isar river at Gruenwald, Germany, with use of steel tube scaffolding
Die Wiederherstellung der Bogenbruecke ueber die Isar bei Gruenwald
Olsen, H. (author)
Bautechnik ; 27
1950
4 pages
Sectional drawings
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of bridge over Isar River at Gruenwald, Germany
Engineering Index Backfile | 1950
|Strengthening of shore ends of the gruenwald bridge over the isar
Engineering Index Backfile | 1928
|Highway bridge over the Isar river at Unterfohring (Germany)
Engineering Index Backfile | 1925
Highway bridge over the Isar river at Unterfohring (Germany)
Engineering Index Backfile | 1925
Steel scaffolding for the main arch of the rocky river bridge at Cleveland, Ohio
Engineering Index Backfile | 1911
|