A platform for research: civil engineering, architecture and urbanism
Bond failure in a concrete culvert
Investigation shows that crack is result of bond failure that defines boundary between work on one day and that on next, and illustrates fact that structural members of concrete should, if possible, be completed at one pouring.
Bond failure in a concrete culvert
Investigation shows that crack is result of bond failure that defines boundary between work on one day and that on next, and illustrates fact that structural members of concrete should, if possible, be completed at one pouring.
Bond failure in a concrete culvert
Eng. World
Serviss, F.L.F. (author) / Gardner, H.W. (author)
Engineering World ; 20
1922
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1939
|Reinforced concrete culvert pipe
Engineering Index Backfile | 1926