A platform for research: civil engineering, architecture and urbanism
Controlling quality of 400,000 cu. yds. of concrete
Saving 56,650 barrels of concrete and obtaining specified strengths at 28 days by definite control of proportions on Queenston-Chippewa hydro-electric development.
Controlling quality of 400,000 cu. yds. of concrete
Saving 56,650 barrels of concrete and obtaining specified strengths at 28 days by definite control of proportions on Queenston-Chippewa hydro-electric development.
Controlling quality of 400,000 cu. yds. of concrete
Concrete
Young, Roderick B. (author)
Concrete ; 21
1922
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
400,000 gallon concrete water tower at Ford factory, Halewood
Engineering Index Backfile | 1963
St. Lambert seaway lock to take over 400,000 yds. Concrete
Engineering Index Backfile | 1956
|Defense Facility Saves Over $400,000 Annually
British Library Online Contents | 1999
400,000 Cubic Yard'Slope Failure on I-26
British Library Conference Proceedings | 1998
|Osisko Drilling 400,000 m at Windfall Lake
Online Contents | 2017