A platform for research: civil engineering, architecture and urbanism
St. Lambert seaway lock to take over 400,000 yds. Concrete
Report on concrete placing during early July, at which time roughly 19,000 cu yd of total had been poured; dimensions of St. Lambert Lock, and all other locks to be constructed in Canada and United States; length between hollow quoins will be 589 ft with usable length of 765 ft between breast wall and fender, width will be 80 ft with minimum depth over sills of 30 ft.
St. Lambert seaway lock to take over 400,000 yds. Concrete
Report on concrete placing during early July, at which time roughly 19,000 cu yd of total had been poured; dimensions of St. Lambert Lock, and all other locks to be constructed in Canada and United States; length between hollow quoins will be 589 ft with usable length of 765 ft between breast wall and fender, width will be 80 ft with minimum depth over sills of 30 ft.
St. Lambert seaway lock to take over 400,000 yds. Concrete
Eng Contract Rec
Reilly, F.J. (author)
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Defense Facility Saves Over $400,000 Annually
British Library Online Contents | 1999
Controlling quality of 400,000 cu. yds. of concrete
Engineering Index Backfile | 1922
|400,000 gallon concrete water tower at Ford factory, Halewood
Engineering Index Backfile | 1963
UNDERWATER REPAIR OF THE ST. LAMBERT LOCK
Online Contents | 1997
|