A platform for research: civil engineering, architecture and urbanism
Rocky Reach Dam
Construction scheduled to start on Rocky Reach Dam, seventh dam in chain of 11 structures that will harness Columbia River between its mouth and Canadian border; length 2820 ft including power-house-intake section of 1090 ft length; height 127 ft above bedrock; initial capability 710,500 kw from seven generating units; ultimate capability 1,012,000 kw from 11 generating units; spillway 750 ft long with 12 Tainter-type gates.
Rocky Reach Dam
Construction scheduled to start on Rocky Reach Dam, seventh dam in chain of 11 structures that will harness Columbia River between its mouth and Canadian border; length 2820 ft including power-house-intake section of 1090 ft length; height 127 ft above bedrock; initial capability 710,500 kw from seven generating units; ultimate capability 1,012,000 kw from 11 generating units; spillway 750 ft long with 12 Tainter-type gates.
Rocky Reach Dam
Pac Bldr Engr
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
|Rocky Reach Kaplan Turbine Replacement
British Library Conference Proceedings | 1997
|Construction of Rocky Reach Hydroelectric Project
ASCE | 2021
|Construction of Rocky Reach Hydroelectric Project
ASCE | 2021
|Grouted cutoff at rocky reach dam
Engineering Index Backfile | 1967
|