A platform for research: civil engineering, architecture and urbanism
Construction of foundations of locks, North Mole and dock extension, North Canal lock system at Bremerhaven
Construction of deep foundations on land and under water, involving driving of steel sheet piling, woodpiles, and construction of heavy masses of reinforced concrete.
Construction of foundations of locks, North Mole and dock extension, North Canal lock system at Bremerhaven
Construction of deep foundations on land and under water, involving driving of steel sheet piling, woodpiles, and construction of heavy masses of reinforced concrete.
Construction of foundations of locks, North Mole and dock extension, North Canal lock system at Bremerhaven
Die Gruendungsarbeiten der Schleusenhaeupter, der Nordmole und der Dockverlaengerung Nordschleusenanlage, Bremerhaven
Martinsen, O. (author) / Oppermann, A. (author)
Bautechnik ; 9
1931
10 pages
23 Figs.
Article (Journal)
Unknown
© Metadata Copyright Elsevier B. V. All rights reserved.
Dredging for north locks system in bremerhaven
Engineering Index Backfile | 1931
|Principles of design and construction of north locks in Bremerhaven
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1895
Geological information from soil tests preliminary to construction of north locks of bremerhaven
Engineering Index Backfile | 1931
|Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Engineering Index Backfile | 1931
|