A platform for research: civil engineering, architecture and urbanism
Extension and improvement of port of Bremer-haven for accommodating latest types of ocean liners, like Bremen and Europa; construction of Weser river locks, including chamber 372 m. long, 60 m. wide, 14. 5 m. deep; excavation, pile driving, erection of movable bridges, construction of seawalls, installation of lock gates, etc.
Extension and improvement of port of Bremer-haven for accommodating latest types of ocean liners, like Bremen and Europa; construction of Weser river locks, including chamber 372 m. long, 60 m. wide, 14. 5 m. deep; excavation, pile driving, erection of movable bridges, construction of seawalls, installation of lock gates, etc.
Principles of design and construction of north locks in Bremerhaven
Die Grund-lagen der Entwurfbearbeitung und Bauausfuehrung der Nordschleusenanlage in Bremerhaven
Agatz, A. (author)
Bautechnik ; 8
1930
18 pages
52 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Dredging for north locks system in bremerhaven
Engineering Index Backfile | 1931
|Geological information from soil tests preliminary to construction of north locks of bremerhaven
Engineering Index Backfile | 1931
|Concreting plant in construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1931
|Foundation and drainage tests preliminary to construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|