A platform for research: civil engineering, architecture and urbanism
Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Methods and costs of excavating 1,200,000 cu. m. at site of locks; handling and driving of wood piles and of steel sheet piling; some 25,000 piles and 80,000 sq. m. of sheet piling were driven; logs of pile driving. (See also - no. 29 July 3, 1931, pp. 435-441)
Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Methods and costs of excavating 1,200,000 cu. m. at site of locks; handling and driving of wood piles and of steel sheet piling; some 25,000 piles and 80,000 sq. m. of sheet piling were driven; logs of pile driving. (See also - no. 29 July 3, 1931, pp. 435-441)
Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Der Bau der Nordschleusenanlage in Bremerhaven. Die Erd- und Rammarbeiten
Schwichow, F. (author)
Bautechnik ; 9
1931
6 pages
29 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting plant in construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Foundation and drainage tests preliminary to construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Sliding gates and bypath sluices of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1931
|Principles of design and construction of north locks in Bremerhaven
Engineering Index Backfile | 1930
|