A platform for research: civil engineering, architecture and urbanism
Concreting plant in construction of northern locks at bremerhaven
Detailed description of layout and equipment for mixing and placing of 244,000 cu. m. of concrete; use of distribution towers, frames, and clamshell buckets; erection of steel forms; average daily output by months; list of equipment used. (See also - no. 32 July 24, 1931, pp. 471-476)
Concreting plant in construction of northern locks at bremerhaven
Detailed description of layout and equipment for mixing and placing of 244,000 cu. m. of concrete; use of distribution towers, frames, and clamshell buckets; erection of steel forms; average daily output by months; list of equipment used. (See also - no. 32 July 24, 1931, pp. 471-476)
Concreting plant in construction of northern locks at bremerhaven
Die Betonierungsanlagen fuer die Nordschleuse in Bremerhaven
Burckas, E. (author)
Bautechnik ; 9
1931
5 pages
34 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting plant and methods on Mississippi River locks
Engineering Index Backfile | 1935
|Concreting of north lock structures in bremerhaven
Engineering Index Backfile | 1931
|Concreting of north lock structures in bremerhaven
Engineering Index Backfile | 1931
|Foundation and drainage tests preliminary to construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Engineering Index Backfile | 1931
|