A platform for research: civil engineering, architecture and urbanism
Description of techniques, characterized by automation, used in placing of 5.2 million cu yd of concrete into dam and powerhouse structure, during 2500 day construction period; type and truck-haul of aggregates; 217 ft high batch plant with 8 bins to hold 3000 tons of aggregate with 6 4-cu yd tilting mixers; electronic unit automatically records content, cycle, and time of every yard of concrete mixed; description of cableways used in placing; equipment for cooling of concrete.
Description of techniques, characterized by automation, used in placing of 5.2 million cu yd of concrete into dam and powerhouse structure, during 2500 day construction period; type and truck-haul of aggregates; 217 ft high batch plant with 8 bins to hold 3000 tons of aggregate with 6 4-cu yd tilting mixers; electronic unit automatically records content, cycle, and time of every yard of concrete mixed; description of cableways used in placing; equipment for cooling of concrete.
Concreting techniques at Glen Canyon dam
Civ Eng (NY)
Peraino, J. (author)
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting deck for Glen Canyon bridge
Engineering Index Backfile | 1959
NTIS | 2006
|Engineering Index Backfile | 1961
|Engineering Index Backfile | 1957