A platform for research: civil engineering, architecture and urbanism
Experience with design and construction of toe dams, decanter lines and towers and tailing dams at Climax, Colo, where they must be placed in rather steep mountain valleys on foundations that are practically impermeable; constant vigilance is necessary in all details of tailing deposits, and is most important in day-to-day operation; importance of investigating signs of erosion, increase in dampness or any other unusual developments.
Experience with design and construction of toe dams, decanter lines and towers and tailing dams at Climax, Colo, where they must be placed in rather steep mountain valleys on foundations that are practically impermeable; constant vigilance is necessary in all details of tailing deposits, and is most important in day-to-day operation; importance of investigating signs of erosion, increase in dampness or any other unusual developments.
Tailing pond design
Min Eng
Windolph, F. (author)
Mining Engineering ; 13
1961
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tailing pond dam body, tailing pond and stacking method of tailing pond dam body
European Patent Office | 2023
|Tailing pond intercepting ditch and tailing pond intercepting system
European Patent Office | 2021
|