A platform for research: civil engineering, architecture and urbanism
TVA harnesses Tennessee river
Tennessee Valley Authority program now includes 11 dams that will provide 9-ft navigation on 650 mi of river, about 7,000,000 acre-ft of water storage for river regulation and flood control, 2,650,000 hp (possible) of generating capacity, and possible primary-power generation increased from 350 million kilowatt-hours at Wilson dam alone to 5.5 billion kilowatt-hours from all dams operating in unified system.
TVA harnesses Tennessee river
Tennessee Valley Authority program now includes 11 dams that will provide 9-ft navigation on 650 mi of river, about 7,000,000 acre-ft of water storage for river regulation and flood control, 2,650,000 hp (possible) of generating capacity, and possible primary-power generation increased from 350 million kilowatt-hours at Wilson dam alone to 5.5 billion kilowatt-hours from all dams operating in unified system.
TVA harnesses Tennessee river
Power
Power ; 80
1936
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Dam project harnesses Savannah River
Engineering Index Backfile | 1959
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1935
SBB harnesses technology to increase capacity
IuD Bahn | 2003
|