A platform for research: civil engineering, architecture and urbanism
Anti-clogging strengthened permeable pile and construction method
Abstract The present invention discloses an anti-clogging strengthened permeable pile and a construction method. A permeable geotextile is strengthened and two-way geogrids are added to form a geotextile tube, which can not only increase the forming capability of a pile body, but also increase the strength of the permeable pile. Then, the geotextile tube is wrapped with a permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid clogging of the permeable concrete pile. In addition, the geogrids themselves have large tensile strength, and enclose the pile body tightly, so that the pile body has high strength and modulus and its resistance to deformation and damage is improved.
Anti-clogging strengthened permeable pile and construction method
Abstract The present invention discloses an anti-clogging strengthened permeable pile and a construction method. A permeable geotextile is strengthened and two-way geogrids are added to form a geotextile tube, which can not only increase the forming capability of a pile body, but also increase the strength of the permeable pile. Then, the geotextile tube is wrapped with a permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid clogging of the permeable concrete pile. In addition, the geogrids themselves have large tensile strength, and enclose the pile body tightly, so that the pile body has high strength and modulus and its resistance to deformation and damage is improved.
Anti-clogging strengthened permeable pile and construction method
CUI XINZHUANG (author) / LI JIN (author) / JIN QING (author) / ZHANG JIONG (author) / WANG JIERU (author) / ZHANG XIAONING (author) / WANG YILIN (author) / LI JUN (author)
2020-10-22
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Anti-clogging strengthened water-permeable pile and construction method
European Patent Office | 2020
|Anti-clogging permeable pavement structure and construction process thereof
European Patent Office | 2020
|Anti-clogging drainage precast pile and construction method thereof
European Patent Office | 2021
|Clogging Prediction of Permeable Pavement
British Library Online Contents | 2016
|