A platform for research: civil engineering, architecture and urbanism
PREFABRICATED FORM FOR KERB CONSTRUCTION AND CONSTRUCTION METHOD OF KERB USING THE SAME
A prefabricated form for use in constructing a casting cured concrete kerb having a plurality of engaging pieces in which adjacent engaging pieces are abutted. Each of the engaging pieces has a fixing rod insertion hole formed thereof. A plurality of spacer insertion holes are formed longitudinally and aligned respectively with the fixing rod insertion holes. The plurality of plate-shaped lower spacers are received respectively of the plurality of spacer insertion holes. Fixing rods are respectively inserted into the fixing rod insertion hole so as to engage the plate-shaped lower spacers. A plurality of upper spacers are engaged with upper ends of the fixing rods so as to fix the engaging pieces in spaced relation to each other.
La présente invention concerne un moule préfabriqué qui permet de fabriquer des pierres de bordure de trottoir et un procédé de fabrication de pierres de bordure de trottoir à l'aide de celui-ci, lesdites pierres de bordure de trottoir étant fabriquées en utilisant les moules préfabriqués dans la construction des pierres de bordure de trottoir formées au niveau de la limite entre une route et un trottoir, ledit procédé facilitant l'installation et le démontage du moule, permettant à celui-ci d'être réutilisé de manière répétée, et comprenant les étapes consistant : afin d'utiliser le moule (100), à placer les moules (100) respectivement sur un côté route et un côté trottoir qui sont espacés par un intervalle de la pierre de bordure de trottoir, des pièces de support de moule (50) étant fixées, par des clous à béton (60), à des intervalles prédéterminés, à une ligne sur laquelle le moule côté route (100) doit être placé, de telle sorte que l'extrémité inférieure du moule côté route (100) est montée sur une rainure de montage (51), et les moules (100) sont situés sur une surface de route sur le côté trottoir ; à insérer des éléments d'espacement inférieurs (30, 30') depuis le côté route vers le côté trottoir dans des trous d'insertion d'élément d'espacement (13, 13') perforés à travers les extrémités inférieures des moules (100) sur les deux côtés ; à insérer des tiges de fixation (20) dans les trous d'insertion de tige de fixation (14, 14') perforés à travers les extrémités supérieures des moules (100) sur les deux côtés, les tiges de fixation (20) étant insérées et fixées par l'intermédiaire de parties d'insertion de tige de fixation (31, 31') des éléments d'espacement inférieurs (30, 30') ; à insérer des parties d'insertion de tige de fixation (41, 41') d'éléments d'espacement supérieurs (40, 40') dans les extrémités supérieures des tiges de fixation (20) de façon à fixer les extrémités supérieures des moules (100), puis à verser et à durcir le béton de telle sorte que les pierres de bordure de trottoir sont fabriquées ; à démonter le moule dans l'ordre des éléments d'espacement supérieurs (40, 40'), des tiges de fixation (20), des moules (100) et des pièces de support de moule (50) ; à couper les deux côtés de l'élément d'espacement inférieur en forme de plaque (50), courbé vers le haut lorsque les moules (100) sont démontés.
PREFABRICATED FORM FOR KERB CONSTRUCTION AND CONSTRUCTION METHOD OF KERB USING THE SAME
A prefabricated form for use in constructing a casting cured concrete kerb having a plurality of engaging pieces in which adjacent engaging pieces are abutted. Each of the engaging pieces has a fixing rod insertion hole formed thereof. A plurality of spacer insertion holes are formed longitudinally and aligned respectively with the fixing rod insertion holes. The plurality of plate-shaped lower spacers are received respectively of the plurality of spacer insertion holes. Fixing rods are respectively inserted into the fixing rod insertion hole so as to engage the plate-shaped lower spacers. A plurality of upper spacers are engaged with upper ends of the fixing rods so as to fix the engaging pieces in spaced relation to each other.
La présente invention concerne un moule préfabriqué qui permet de fabriquer des pierres de bordure de trottoir et un procédé de fabrication de pierres de bordure de trottoir à l'aide de celui-ci, lesdites pierres de bordure de trottoir étant fabriquées en utilisant les moules préfabriqués dans la construction des pierres de bordure de trottoir formées au niveau de la limite entre une route et un trottoir, ledit procédé facilitant l'installation et le démontage du moule, permettant à celui-ci d'être réutilisé de manière répétée, et comprenant les étapes consistant : afin d'utiliser le moule (100), à placer les moules (100) respectivement sur un côté route et un côté trottoir qui sont espacés par un intervalle de la pierre de bordure de trottoir, des pièces de support de moule (50) étant fixées, par des clous à béton (60), à des intervalles prédéterminés, à une ligne sur laquelle le moule côté route (100) doit être placé, de telle sorte que l'extrémité inférieure du moule côté route (100) est montée sur une rainure de montage (51), et les moules (100) sont situés sur une surface de route sur le côté trottoir ; à insérer des éléments d'espacement inférieurs (30, 30') depuis le côté route vers le côté trottoir dans des trous d'insertion d'élément d'espacement (13, 13') perforés à travers les extrémités inférieures des moules (100) sur les deux côtés ; à insérer des tiges de fixation (20) dans les trous d'insertion de tige de fixation (14, 14') perforés à travers les extrémités supérieures des moules (100) sur les deux côtés, les tiges de fixation (20) étant insérées et fixées par l'intermédiaire de parties d'insertion de tige de fixation (31, 31') des éléments d'espacement inférieurs (30, 30') ; à insérer des parties d'insertion de tige de fixation (41, 41') d'éléments d'espacement supérieurs (40, 40') dans les extrémités supérieures des tiges de fixation (20) de façon à fixer les extrémités supérieures des moules (100), puis à verser et à durcir le béton de telle sorte que les pierres de bordure de trottoir sont fabriquées ; à démonter le moule dans l'ordre des éléments d'espacement supérieurs (40, 40'), des tiges de fixation (20), des moules (100) et des pièces de support de moule (50) ; à couper les deux côtés de l'élément d'espacement inférieur en forme de plaque (50), courbé vers le haut lorsque les moules (100) sont démontés.
PREFABRICATED FORM FOR KERB CONSTRUCTION AND CONSTRUCTION METHOD OF KERB USING THE SAME
MOULE PREFABRIQUE POUR FABRIQUER DES PIERRES DE BORDURE DE TROTTOIR ET PROCEDE DE FABRICATION DE PIERRES DE BORDURE DE TROTTOIR A L'AIDE DE CELUI-CI
PARK HAE YOUNG (author)
2018-05-22
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2018
|European Patent Office | 2016
|