A platform for research: civil engineering, architecture and urbanism
High-early-strength filling material for coal mine goaf
The invention relates to a high-early-strength filling material for a coal mine goaf. The high-early-strength filling material is prepared from the following components in parts by weight: 10-20 parts of quick-hardening sulphate aluminate cement, 40-80 parts of coal ash, 150-200 parts of coal gangue particles, 1-3 parts of a content-available superplasticizer and 0.1-1 part of a thickener. The high-early-strength filling material is used for filling the coal mine goaf and is remotely pumped, and is high in strength increase speed and filling efficiency, low in filling cost, safe and environmentally friendly. An experiment shows that the early strength of the high-early-strength filling material is high and can reach 10.0MPa, and the compressive strength can reach 18.0MPa in the 28th day.
High-early-strength filling material for coal mine goaf
The invention relates to a high-early-strength filling material for a coal mine goaf. The high-early-strength filling material is prepared from the following components in parts by weight: 10-20 parts of quick-hardening sulphate aluminate cement, 40-80 parts of coal ash, 150-200 parts of coal gangue particles, 1-3 parts of a content-available superplasticizer and 0.1-1 part of a thickener. The high-early-strength filling material is used for filling the coal mine goaf and is remotely pumped, and is high in strength increase speed and filling efficiency, low in filling cost, safe and environmentally friendly. An experiment shows that the early strength of the high-early-strength filling material is high and can reach 10.0MPa, and the compressive strength can reach 18.0MPa in the 28th day.
High-early-strength filling material for coal mine goaf
LIU XIAOBIN (author) / SONG MINGYU (author) / XIONG WEIFENG (author)
2015-04-29
Patent
Electronic Resource
English
European Patent Office | 2024
|Mining goaf filling material prepared from mine tailings
European Patent Office | 2021
|Layered filling process for near-slope goaf of metal surface mine
European Patent Office | 2024
|