A platform for research: civil engineering, architecture and urbanism
Method for adjusting overall line shape of continuous catwalk of suspension bridge
The invention relates to the technical field of bridge engineering construction, in particular to a method for adjusting the overall line shape of a continuous catwalk of a suspension bridge. The adjusting method comprises the steps that after the whole catwalk is erected, a plurality of jacks are arranged at the connecting position of each catwalk bearing cable and an anchorage; the jacks are used for carrying out tensioning or loosening of two to three strokes on the catwalk bearing cables in sequence; then a guide chain is arranged at the position, at the top of a main tower, of each catwalk bearing cable, all the guide chains are pulled manually in the same direction at the same time, and one-time overall line shape adjustment is carried out on each catwalk bearing cable in the direction required to be adjusted; adjustment is carried out continuously and alternately many times till the overall line shape of the catwalk achieves a designed line shape. According to the adjusting method, the line shape of the catwalk can meet design requirements, and the safety and convenience of construction are guaranteed.
Method for adjusting overall line shape of continuous catwalk of suspension bridge
The invention relates to the technical field of bridge engineering construction, in particular to a method for adjusting the overall line shape of a continuous catwalk of a suspension bridge. The adjusting method comprises the steps that after the whole catwalk is erected, a plurality of jacks are arranged at the connecting position of each catwalk bearing cable and an anchorage; the jacks are used for carrying out tensioning or loosening of two to three strokes on the catwalk bearing cables in sequence; then a guide chain is arranged at the position, at the top of a main tower, of each catwalk bearing cable, all the guide chains are pulled manually in the same direction at the same time, and one-time overall line shape adjustment is carried out on each catwalk bearing cable in the direction required to be adjusted; adjustment is carried out continuously and alternately many times till the overall line shape of the catwalk achieves a designed line shape. According to the adjusting method, the line shape of the catwalk can meet design requirements, and the safety and convenience of construction are guaranteed.
Method for adjusting overall line shape of continuous catwalk of suspension bridge
CHEN GUOXIANG (author) / FENG YI (author) / XIE HONGYUE (author) / ZHOU CHANGDONG (author) / HAN SHENGLI (author) / XU XIN (author) / ZHENG DACHAO (author) / TIAN JIKAI (author) / ZHU LIANGHONG (author) / LIU YUFENG (author)
2015-05-20
Patent
Electronic Resource
English
IPC:
E01D
BRIDGES
,
Brücken
Overall adjusting device and method for catwalk rope of suspension bridge
European Patent Office | 2024
|Linear adjusting method for continuous catwalk of suspension bridge
European Patent Office | 2020
|Construction method for overall erection of catwalk bearing cable of suspension bridge
European Patent Office | 2023
|Anchoring adjusting device for catwalk bearing cable of suspension bridge
European Patent Office | 2023
|