Chimney glass fiber reinforced plastic inner tube fast installation method
The invention provides a chimney glass fiber reinforced plastic inner tube fast installation method. The method includes the steps that a hoisting device is arranged on the top of a chimney; chimney glass fiber reinforced plastic inner tube segments arranged on the ground are hoisted to the top of the chimney through the hoisting device; the chimney glass fiber reinforced plastic inner tube segments hoisted to the top of the chimney are lowered to the interior of the chimney from a smoke outlet in the top of the chimney through the hoisting device; fast installation joints arranged between the top ends and the bottom ends of the chimney glass fiber reinforced plastic inner tube segments are used for sequentially connecting the adjacent chimney glass fiber reinforced plastic inner tube segments in an end-to-end mode; the steps are repeated till all the chimney glass fiber reinforced plastic inner tube segments are installed in the chimney. Due to the fact the hoisting device is arranged on the top of the chimney and the chimney glass fiber reinforced plastic inner tube segments are hoisted into the chimney and connected, a chimney glass fiber reinforced plastic inner tube can be transported and managed conveniently, installing difficulty is reduced, engineering time is shortened, and installing efficiency and safety of the chimney glass fiber reinforced plastic inner tube are improved.
Chimney glass fiber reinforced plastic inner tube fast installation method
The invention provides a chimney glass fiber reinforced plastic inner tube fast installation method. The method includes the steps that a hoisting device is arranged on the top of a chimney; chimney glass fiber reinforced plastic inner tube segments arranged on the ground are hoisted to the top of the chimney through the hoisting device; the chimney glass fiber reinforced plastic inner tube segments hoisted to the top of the chimney are lowered to the interior of the chimney from a smoke outlet in the top of the chimney through the hoisting device; fast installation joints arranged between the top ends and the bottom ends of the chimney glass fiber reinforced plastic inner tube segments are used for sequentially connecting the adjacent chimney glass fiber reinforced plastic inner tube segments in an end-to-end mode; the steps are repeated till all the chimney glass fiber reinforced plastic inner tube segments are installed in the chimney. Due to the fact the hoisting device is arranged on the top of the chimney and the chimney glass fiber reinforced plastic inner tube segments are hoisted into the chimney and connected, a chimney glass fiber reinforced plastic inner tube can be transported and managed conveniently, installing difficulty is reduced, engineering time is shortened, and installing efficiency and safety of the chimney glass fiber reinforced plastic inner tube are improved.
Chimney glass fiber reinforced plastic inner tube fast installation method
WANG GENYU (author) / ZHAO GUANGQING (author) / LIU YUJIN (author)
2015-05-20
Patent
Electronic Resource
English
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Hollow heat-preservation glass fiber reinforced plastic chimney
European Patent Office | 2020
|Construction equipment and construction method for glass fiber reinforced plastic chimney lining
European Patent Office | 2021
|Glass fiber reinforced plastic anti-corrosion chimney convenient for later maintenance
European Patent Office | 2022
|European Patent Office | 2023
|