Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
The invention discloses a waterproof construction process for a joint of an inner support upright post of a foundation pit and a bottom plate, and relates to the technical field of building construction. According to the waterproof construction process, a double-sided self-adhesive waterproof coiled material is utilized for overlapping type waterproof system operation by virtue of a DAL wet laying method, so that problems of waterproof construction in a water environment are solved; the permeability of a cement-based permeable crystalline type waterproof material is utilized, so that self-sealing waterproofness in concrete is achieved; the watertightness of a watertight steel plate is utilized, so that waterproof construction quality is effectively ensured; an embedded galvanized steel pipe is utilized, and a water suction pump is externally connected, so that the influence of water pressure on poured concrete is reduced, and concrete pouring quality is improved; characteristics of micro-expanded impermeable concrete (or non-shrinkage impermeable concrete instead) are utilized, so that an interface of fresh and old concrete is further compacted.
Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
The invention discloses a waterproof construction process for a joint of an inner support upright post of a foundation pit and a bottom plate, and relates to the technical field of building construction. According to the waterproof construction process, a double-sided self-adhesive waterproof coiled material is utilized for overlapping type waterproof system operation by virtue of a DAL wet laying method, so that problems of waterproof construction in a water environment are solved; the permeability of a cement-based permeable crystalline type waterproof material is utilized, so that self-sealing waterproofness in concrete is achieved; the watertightness of a watertight steel plate is utilized, so that waterproof construction quality is effectively ensured; an embedded galvanized steel pipe is utilized, and a water suction pump is externally connected, so that the influence of water pressure on poured concrete is reduced, and concrete pouring quality is improved; characteristics of micro-expanded impermeable concrete (or non-shrinkage impermeable concrete instead) are utilized, so that an interface of fresh and old concrete is further compacted.
Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
SHI WEIGUO (author) / WU BIQIAO (author) / LE YU (author) / XIE WENHUA (author) / LIU QIUSHENG (author)
2015-05-27
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Waterproof construction method for joint of inner supporting stand column and bottom plate
European Patent Office | 2022
|Foundation pit connecting position bottom plate waterproof structure and construction method
European Patent Office | 2023
|Bottom plate corner waterproof connecting joint and construction method thereof
European Patent Office | 2024
|