A platform for research: civil engineering, architecture and urbanism
Tower crane construction technology used for super high-rise building steel structure
The invention relates to the technical field of engineering construction, in particular to a tower crane construction technology used for a super high-rise building steel structure. The tower crane construction technology used for the super high-rise building steel structure comprises the following steps: a) carrying out tower crane model selection and tower crane plane arrangement; b) carrying out tower crane climbing analysis which comprises the structure setting of a tower crane climbing system and climbing elevation determination; c) carrying out tower crane climbing; d) calculating the internal force and the displacement of a core tube shear wall structure which bears tower crane load and creeping formwork load. Compared with the prior art, the tower crane construction technology has the advantages of reasonable process design and high actionability; according to repeated experiments, the tower crane construction technology is strictly executed according to a working condition set in a scheme, and the deformation of the core tube shear wall is within an allowable range of a standard through multiple times of practical observation. Practice proves that the function configuration and the plane arrangement of the construction engineering of a high-rise steel structure and a large tower crane are reasonable; the design of a climbing system and a climbing technology are advanced and proper; calculation relevant to the tower crane load is correct, and the whole working state of the tower crane is safe and reliable.
Tower crane construction technology used for super high-rise building steel structure
The invention relates to the technical field of engineering construction, in particular to a tower crane construction technology used for a super high-rise building steel structure. The tower crane construction technology used for the super high-rise building steel structure comprises the following steps: a) carrying out tower crane model selection and tower crane plane arrangement; b) carrying out tower crane climbing analysis which comprises the structure setting of a tower crane climbing system and climbing elevation determination; c) carrying out tower crane climbing; d) calculating the internal force and the displacement of a core tube shear wall structure which bears tower crane load and creeping formwork load. Compared with the prior art, the tower crane construction technology has the advantages of reasonable process design and high actionability; according to repeated experiments, the tower crane construction technology is strictly executed according to a working condition set in a scheme, and the deformation of the core tube shear wall is within an allowable range of a standard through multiple times of practical observation. Practice proves that the function configuration and the plane arrangement of the construction engineering of a high-rise steel structure and a large tower crane are reasonable; the design of a climbing system and a climbing technology are advanced and proper; calculation relevant to the tower crane load is correct, and the whole working state of the tower crane is safe and reliable.
Tower crane construction technology used for super high-rise building steel structure
WAN CHANGFENG (author) / ZHANG WENRONG (author) / JIN QIANHUA (author) / LI ZONGBIAO (author) / XIA ZONGFU (author) / CHEN YILIN (author)
2015-05-27
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of tower crown structure of super high-rise building
European Patent Office | 2022
|Modular structure assembling construction method for super-high-rise building decoration tower
European Patent Office | 2015
|European Patent Office | 2022
|Mounting method for super high-rise building steel structure construction
European Patent Office | 2022
|Tower crane foundation structure of construction-free tower crane pile
European Patent Office | 2024
|