A platform for research: civil engineering, architecture and urbanism
Construction method for five-shaft cement mixing pile without squeezing soil
The invention relates to a construction method for a five-shaft cement mixing pile without soil compaction; a machine used in the construction method is a non-squeezing five-shaft cement mixing machine (namely, FCW-A construction machine). In the machine, five drill pipes are arranged side by side and comprise ordinary polished drill pipes and small-margin threaded drill pipes. The five drill pipes can be combined freely by the two kinds of drill pipes according to rules and construction requirements. During construction, the small-margin threaded drill pipes rotate forward to lift soil to the ground so as to adjust the imbalance of soil pressure in the pile. The construction method is adopted to construct the cement mixing pile and has the advantages of being rapid in pile formation speed, uniform in mixing, high in strength, strong in anti-permeation capacity, environment-friendly and green and the like.
Construction method for five-shaft cement mixing pile without squeezing soil
The invention relates to a construction method for a five-shaft cement mixing pile without soil compaction; a machine used in the construction method is a non-squeezing five-shaft cement mixing machine (namely, FCW-A construction machine). In the machine, five drill pipes are arranged side by side and comprise ordinary polished drill pipes and small-margin threaded drill pipes. The five drill pipes can be combined freely by the two kinds of drill pipes according to rules and construction requirements. During construction, the small-margin threaded drill pipes rotate forward to lift soil to the ground so as to adjust the imbalance of soil pressure in the pile. The construction method is adopted to construct the cement mixing pile and has the advantages of being rapid in pile formation speed, uniform in mixing, high in strength, strong in anti-permeation capacity, environment-friendly and green and the like.
Construction method for five-shaft cement mixing pile without squeezing soil
XIE XIAODONG (author) / XIE YIFEI (author) / ZHOU YUSHI (author) / ZHAO WEIMING (author) / HUANG LIWEI (author) / BAO GUOQIANG (author) / TANG WU (author) / ZHANG QUN (author)
2015-06-03
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
European Patent Office | 2021
|Three-shaft cement mixing pile machine construction method
European Patent Office | 2024
|Cement-soil mixing pile construction system and method and cement-soil mixing pile
European Patent Office | 2023
|Cement soil occlusion mixing pile vertical shaft locking opening construction technology
European Patent Office | 2024
|European Patent Office | 2023
|