A platform for research: civil engineering, architecture and urbanism
Flexible pier-side girder erecting platform and construction method thereof
The invention discloses a flexible pier-side girder erecting platform and a construction method thereof, and relates to the field of bridge construction. The platform comprises a steel box girder platform which is arranged on the outer side of a main tower cross beam; the main tower cross beam is positioned between a first tower column and a second tower column which are opposite to each other; a first cable-stay system is arranged between the steel box girder platform and the first tower column; one end of the first cable-stay system is connected with the steel box girder platform; the other end of the first cable-stay system is connected with the first tower column; a second cable-stay system is arranged between the steel box girder platform and the second tower column; one end of the second cable-stay system is connected with the steel box girder platform; the other end of the second cable-stay system is connected with the second tower column. A longitudinal locking device is arranged between the steel box girder platform and each of the first tower column and the second tower column. The flexible pier-side girder erecting platform is not restricted by terrain conditions; the construction difficulty is relatively low; moreover, the cost can be reduced.
Flexible pier-side girder erecting platform and construction method thereof
The invention discloses a flexible pier-side girder erecting platform and a construction method thereof, and relates to the field of bridge construction. The platform comprises a steel box girder platform which is arranged on the outer side of a main tower cross beam; the main tower cross beam is positioned between a first tower column and a second tower column which are opposite to each other; a first cable-stay system is arranged between the steel box girder platform and the first tower column; one end of the first cable-stay system is connected with the steel box girder platform; the other end of the first cable-stay system is connected with the first tower column; a second cable-stay system is arranged between the steel box girder platform and the second tower column; one end of the second cable-stay system is connected with the steel box girder platform; the other end of the second cable-stay system is connected with the second tower column. A longitudinal locking device is arranged between the steel box girder platform and each of the first tower column and the second tower column. The flexible pier-side girder erecting platform is not restricted by terrain conditions; the construction difficulty is relatively low; moreover, the cost can be reduced.
Flexible pier-side girder erecting platform and construction method thereof
DAI HAO (author) / TU MANMING (author) / PAN DONGFA (author) / MAO WEIQI (author) / HU HANZHOU (author) / WEN WUSONG (author) / JI YUEHUA (author) / WU FANGMING (author) / XU JIAPING (author) / MA TAO (author)
2015-07-22
Patent
Electronic Resource
English
IPC:
E01D
BRIDGES
,
Brücken
Erecting method of pier-beam integrated construction bridge girder erection machine
European Patent Office | 2022
|Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2023
|Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2022
METHOD FOR ERECTING SEGMENTAL STEEL GIRDER ON PIER-TOP SHORT SLIDEWAY GIRDER
European Patent Office | 2021
|Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2024
|