A platform for research: civil engineering, architecture and urbanism
Top-down mounting and constructing method of soft-steel energy-dissipation damper system
The invention provides a top-down mounting and constructing method of a soft-steel energy-dissipation damper system. The top-down mounting and constructing method includes binding upper bracket wall ribs and mounting an upper bracket embedded plate in advance; erecting and reinforcing an upper bracket wall casting template and casting upper bracket wall concrete; demounting the upper bracket wall casting template after an upper bracket wall is formed; mounting a damper and welding a lower bracket embedded plate on a lower damper connecting plate; binding lower bracket wall ribs, and erecting and reinforcing a lower bracket wall casting template; opening the upper portion of the lower bracket wall, mounting a discharge hopper and casting lower bracket wall concrete; demounting the lower bracket wall casting template after the lower bracket wall is formed. The damper system is mounted from top to bottom, the lower bracket wall can be adjusted slightly after casting of the upper bracket wall, and the problem of failure in damper mounting due to error caused by construction quality is avoided.
Top-down mounting and constructing method of soft-steel energy-dissipation damper system
The invention provides a top-down mounting and constructing method of a soft-steel energy-dissipation damper system. The top-down mounting and constructing method includes binding upper bracket wall ribs and mounting an upper bracket embedded plate in advance; erecting and reinforcing an upper bracket wall casting template and casting upper bracket wall concrete; demounting the upper bracket wall casting template after an upper bracket wall is formed; mounting a damper and welding a lower bracket embedded plate on a lower damper connecting plate; binding lower bracket wall ribs, and erecting and reinforcing a lower bracket wall casting template; opening the upper portion of the lower bracket wall, mounting a discharge hopper and casting lower bracket wall concrete; demounting the lower bracket wall casting template after the lower bracket wall is formed. The damper system is mounted from top to bottom, the lower bracket wall can be adjusted slightly after casting of the upper bracket wall, and the problem of failure in damper mounting due to error caused by construction quality is avoided.
Top-down mounting and constructing method of soft-steel energy-dissipation damper system
FENG YUN (author) / ZHENG YONGZHENG (author) / CHEN JIANQUAN (author) / ZHANG LEI (author) / LIU HONGSHA (author)
2015-08-19
Patent
Electronic Resource
English
Controllable strain amplitude energy dissipation steel damper
European Patent Office | 2022
|Construction method of building damping coupling beam type soft steel damper mounting system
European Patent Office | 2020
|