Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for underfilling a track by means of asynchronously moved tamping units
For underfilling two adjacent sleepers (9) of a rail (3), two adjoining tamping units (2) are lowered, jointly, with a time delay. Thus in particular the dipping of directly adjacent internal tamping tines (20) into a common sleeper bay (18) is simplified.
Method for underfilling a track by means of asynchronously moved tamping units
For underfilling two adjacent sleepers (9) of a rail (3), two adjoining tamping units (2) are lowered, jointly, with a time delay. Thus in particular the dipping of directly adjacent internal tamping tines (20) into a common sleeper bay (18) is simplified.
Method for underfilling a track by means of asynchronously moved tamping units
SPRINGER HEINZ (Autor:in)
02.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Method for tamping a track by means of asynchronously moved tamping units
Europäisches Patentamt | 2017
|METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
Europäisches Patentamt | 2015
|