A platform for research: civil engineering, architecture and urbanism
Large-area RC basement structure sequence construction method
The invention provides a large-area RC basement structure sequence construction method. Firstly, a large-area RC basement is structurally decomposed, and warehouse dividing arrangement, operation conducted according to a rebar binding method, construction joint arrangement, concrete pouring, concrete curing, concrete temperature measurement and briquette retention are sequentially conducted. According to the large-area RC basement structure sequence construction method, a sequence method is adopted for replacing a construction post-cast strip, related work such as RC basement backfill and the like is conducted in advance, engineering construction efficiency is improved, and construction cost is reduced. Construction control is strict, and structural concrete early-stage cracks of the RC basement are effectively controlled. The concrete mixing ratio is optimized, the cement use amount is controlled, and structural concrete shrinkage distortion of the RC basement is effectively controlled. The waterproof quality of concrete of an RC basement structural outer wall and a bottom plate are improved.
Large-area RC basement structure sequence construction method
The invention provides a large-area RC basement structure sequence construction method. Firstly, a large-area RC basement is structurally decomposed, and warehouse dividing arrangement, operation conducted according to a rebar binding method, construction joint arrangement, concrete pouring, concrete curing, concrete temperature measurement and briquette retention are sequentially conducted. According to the large-area RC basement structure sequence construction method, a sequence method is adopted for replacing a construction post-cast strip, related work such as RC basement backfill and the like is conducted in advance, engineering construction efficiency is improved, and construction cost is reduced. Construction control is strict, and structural concrete early-stage cracks of the RC basement are effectively controlled. The concrete mixing ratio is optimized, the cement use amount is controlled, and structural concrete shrinkage distortion of the RC basement is effectively controlled. The waterproof quality of concrete of an RC basement structural outer wall and a bottom plate are improved.
Large-area RC basement structure sequence construction method
ZHOU QING (author) / GE SHAOKUN (author) / ZHAN CHAOYANG (author) / LIU CHAO (author) / CHEN QUAN (author) / XU NINGBO (author)
2015-10-07
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Construction method for preventing leakage of large-area basement
European Patent Office | 2021
|Waterproof construction method for large-area civil air defense basement
European Patent Office | 2021
|Waterproof construction method of large-area civil air defense basement
European Patent Office | 2020
|BASEMENT ATTIC STRUCTURE, AND BASEMENT CONSTRUCTION METHOD USING THE BASEMENT ATTIC STRUCTURE
European Patent Office | 2018
|