A platform for research: civil engineering, architecture and urbanism
Balcony beam slab inner side filling wall body and main body structure integral casting construction method
The invention relates to a balcony beam slab inner side filling wall body and main body structure integral casting construction method. According to the construction method, the twice structure casting is put forward before the casting step; and a cast filling wall is arranged in grooves formed in the inner side of a beam steel bar and the inner side of a flange steel bar, and is integrally cast with a main body structure. The construction method has the advantages that the manufacturing of a formwork is simple; the reinforcement is convenient; a hollow mold is omitted; the supporting and the dismounting are convenient; building body materials used by a secondary structure are used in advance; the filling wall building work amount of the secondary structure is reduced; meanwhile, the work procedure clearance time is reduced; the integral economic benefits are good; the construction quality is high; the number of times of using a scaffold during the later-stage building is reduced; and the problems of construction quality and construction loss due to aerated concrete block cutting during the later-stage building are avoided.
Balcony beam slab inner side filling wall body and main body structure integral casting construction method
The invention relates to a balcony beam slab inner side filling wall body and main body structure integral casting construction method. According to the construction method, the twice structure casting is put forward before the casting step; and a cast filling wall is arranged in grooves formed in the inner side of a beam steel bar and the inner side of a flange steel bar, and is integrally cast with a main body structure. The construction method has the advantages that the manufacturing of a formwork is simple; the reinforcement is convenient; a hollow mold is omitted; the supporting and the dismounting are convenient; building body materials used by a secondary structure are used in advance; the filling wall building work amount of the secondary structure is reduced; meanwhile, the work procedure clearance time is reduced; the integral economic benefits are good; the construction quality is high; the number of times of using a scaffold during the later-stage building is reduced; and the problems of construction quality and construction loss due to aerated concrete block cutting during the later-stage building are avoided.
Balcony beam slab inner side filling wall body and main body structure integral casting construction method
JIANG LIN (author) / JIANG SHENG (author) / ZHU YINLONG (author) / MIN YUE (author) / LIU BOWEI (author) / WANG DONG (author) / YANG JIANZHONG (author) / ZHOU XINFENG (author) / GUO XIAOFENG (author)
2015-11-18
Patent
Electronic Resource
English
Connecting method filling gap between wall body and main body structure beam
European Patent Office | 2021
|BALCONY CONSTRUCTION STRUCTURE AND BALCONY CONSTRUCTION METHOD
European Patent Office | 2024
|European Patent Office | 2024
|Construction structure of balcony integral type building structure
European Patent Office | 2018
|