A platform for research: civil engineering, architecture and urbanism
Rock anchoring construction method for implanted pipe of structural steel trestle
The invention relates to the technical field of pile foundation construction of structural steel trestles and aims at providing a rock anchoring construction method for an implanted pipe of a structural steel trestle. The rock anchoring construction method includes the steps of staking out in a survey, guiding frame laying, steel pipe pile lowering, horizontal support welding, concrete bagging and lowering, operation platform laying, borehole coring, concrete steel pipe burying, structural steel erecting and welding and the like. According to the construction method, a concrete steel pipe is implanted in a trestle pipe pile, in other words, stability of the external pipe pile is achieved under shearing resistance of the concrete steel pipe anchored in a rock layer, and the rock anchoring effect is achieved. Thus, the cost input of materials and equipment is small, the pipe pile recovery rate is high, the technology of the whole construction method is simple, operation is convenient, and the construction period is short.
Rock anchoring construction method for implanted pipe of structural steel trestle
The invention relates to the technical field of pile foundation construction of structural steel trestles and aims at providing a rock anchoring construction method for an implanted pipe of a structural steel trestle. The rock anchoring construction method includes the steps of staking out in a survey, guiding frame laying, steel pipe pile lowering, horizontal support welding, concrete bagging and lowering, operation platform laying, borehole coring, concrete steel pipe burying, structural steel erecting and welding and the like. According to the construction method, a concrete steel pipe is implanted in a trestle pipe pile, in other words, stability of the external pipe pile is achieved under shearing resistance of the concrete steel pipe anchored in a rock layer, and the rock anchoring effect is achieved. Thus, the cost input of materials and equipment is small, the pipe pile recovery rate is high, the technology of the whole construction method is simple, operation is convenient, and the construction period is short.
Rock anchoring construction method for implanted pipe of structural steel trestle
ZHANG YUNHAO (author) / SHU YUZHENG (author) / ZHONG KAI (author) / XU YANFENG (author) / HU MIN (author) / XU BINBIN (author)
2016-01-13
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Construction method for anchoring steel trestle steel pipe piles on thin covering riverbed
European Patent Office | 2022
|European Patent Office | 2024
|Rock-socketed miniature steel pipe pile trestle foundation construction method
European Patent Office | 2023
|Steel trestle steel pipe pile anchoring method for pile bottom anchor rod reinforcement
European Patent Office | 2020
|