Assembled pre-stressed anchor cable wind turbine foundation system and construction method thereof
The invention discloses an assembled pre-stressed anchor cable wind turbine foundation system and a construction method thereof, and relates to the technical field of large wind turbine generator set fixing in construction engineering. The system is characterized in that a foundation bottom ring, a combined concrete cylinder and a foundation top ring are sequentially arranged on the inner wall of a round foundation pit from bottom to top; a precast concrete bottom element, backfill and a precast concrete top element are sequentially arranged in the combined concrete cylinder from bottom to top; a pre-stressed anchor cable penetrates the foundation bottom ring, a through hole of the combined concrete cylinder and the foundation top ring sequentially from bottom to top; and high-strength nuts are connected to the top surface of the foundation bottom ring and the top surface of the foundation top ring respectively. The foundation is firm; engineering investment is reduced; the construction progress is fast; and especially, the pre-stressed anchor cable can provide larger prestress, it is effectively avoided that a wind turbine tower inclines due to overlarge bending moment, and it can be guaranteed that a wind turbine operates safely under extreme conditions.
Assembled pre-stressed anchor cable wind turbine foundation system and construction method thereof
The invention discloses an assembled pre-stressed anchor cable wind turbine foundation system and a construction method thereof, and relates to the technical field of large wind turbine generator set fixing in construction engineering. The system is characterized in that a foundation bottom ring, a combined concrete cylinder and a foundation top ring are sequentially arranged on the inner wall of a round foundation pit from bottom to top; a precast concrete bottom element, backfill and a precast concrete top element are sequentially arranged in the combined concrete cylinder from bottom to top; a pre-stressed anchor cable penetrates the foundation bottom ring, a through hole of the combined concrete cylinder and the foundation top ring sequentially from bottom to top; and high-strength nuts are connected to the top surface of the foundation bottom ring and the top surface of the foundation top ring respectively. The foundation is firm; engineering investment is reduced; the construction progress is fast; and especially, the pre-stressed anchor cable can provide larger prestress, it is effectively avoided that a wind turbine tower inclines due to overlarge bending moment, and it can be guaranteed that a wind turbine operates safely under extreme conditions.
Assembled pre-stressed anchor cable wind turbine foundation system and construction method thereof
LU ZHENG (author) / YAO HAILIN (author) / HE WEIDONG (author) / LIU JIE (author) / FANG RAN (author)
2016-01-13
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
European Patent Office | 2023
|Construction method of foundation pit slope pre-stressed anchor cable
European Patent Office | 2024
|Foundation pit support construction scheme and pre-stressed anchor cable construction scheme thereof
European Patent Office | 2022
|Recyclable pre-stressed anchor cable for foundation pit supporting and construction method thereof
European Patent Office | 2022
|Pre-stressed anchor cable device and installation construction method of pre-stressed anchor cable
European Patent Office | 2023
|