Construction method for fast restoring road traffic in construction of underground project
The invention provides a construction method for fast restoring road traffic in construction of an underground project. The construction method comprises the following steps that (1) a foundation ditch is excavated in a stratified mode in a design position of the foundation ditch; (2) a plurality of middle columns are arranged in the foundation ditch sequentially and longitudinally; (3) cross beams are arranged between continuous walls on the two transverse sides of the foundation ditch, and a plurality of longitudinal beams are arranged between every two neighboring cross beams; (4) a temporary road surface is laid on the longitudinal beams; (5) earth excavation in the foundation ditch; and (6) after the project is finished, a permanent road is laid on the top face of the foundation ditch. The construction method for fast restoring the road traffic in construction of the underground project is conducted according to the basic construction steps in a cover-excavation method, and a standardized, modular and reusable novel temporary road surface system can be established through the cover-excavation method. Fast assembly and disassembly can be achieved. In addition, the traffic is reasonably organized in the whole construction process, so that the purpose of no traffic interruption is achieved, and accordingly the contradictory issue between construction and the existing traffic is solved.
Construction method for fast restoring road traffic in construction of underground project
The invention provides a construction method for fast restoring road traffic in construction of an underground project. The construction method comprises the following steps that (1) a foundation ditch is excavated in a stratified mode in a design position of the foundation ditch; (2) a plurality of middle columns are arranged in the foundation ditch sequentially and longitudinally; (3) cross beams are arranged between continuous walls on the two transverse sides of the foundation ditch, and a plurality of longitudinal beams are arranged between every two neighboring cross beams; (4) a temporary road surface is laid on the longitudinal beams; (5) earth excavation in the foundation ditch; and (6) after the project is finished, a permanent road is laid on the top face of the foundation ditch. The construction method for fast restoring the road traffic in construction of the underground project is conducted according to the basic construction steps in a cover-excavation method, and a standardized, modular and reusable novel temporary road surface system can be established through the cover-excavation method. Fast assembly and disassembly can be achieved. In addition, the traffic is reasonably organized in the whole construction process, so that the purpose of no traffic interruption is achieved, and accordingly the contradictory issue between construction and the existing traffic is solved.
Construction method for fast restoring road traffic in construction of underground project
SONG WEIJUN (author) / QI ZHANGUO (author) / ZHANG HAISHUN (author) / LI XIANGHAI (author) / QI WEIZHI (author) / ZHANG QING (author) / TIAN LIANG (author) / YU CHUNHONG (author) / REN YANLONG (author)
2016-01-20
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Construction Method of Underground Road to Minimize Traffic Control
European Patent Office | 2023
|construction for underground road way and the method of construction thereof
European Patent Office | 2018
|