A platform for research: civil engineering, architecture and urbanism
Garden road construction method
The invention provides a garden road construction method. The garden road construction method comprises the following steps: marking a to-be-poured area according to a planning size; cleaning the to-be-poured area, and reducing the pavement height of the to-be-poured area; building a reinforcing mesh in the to-be-poured area; erecting a plurality of formworks on the two sides of the to-be-poured area, sequentially arranging the formworks in the extending direction of the to-be-poured area, and pouring concrete between the formworks on the two sides to form a concrete reinforcing steel bar layer in the to-be-poured area; after the concrete reinforcing steel bar layer is condensed and stabilized, dismantling the formworks on the two sides; and checking the condensed reinforced concrete layer, and repairing the reinforced concrete layer. The road construction quality is high and the service life of the road is long.
本发明提供了一种园林道路施工方法,一种园林道路施工方法,施工方法包括如下步骤:依据规划尺寸标记待浇筑区域;清理待浇筑区域,并降低待浇筑区域的路面高度;在待浇筑区域搭建钢筋网;在待浇筑区域的两侧架设多个模板,多个模板沿待浇筑区域的延伸方向依次排布,在两侧的模板之间浇筑混凝土以使待浇筑区域形成混凝土钢筋层;待混凝土钢筋层凝结稳固后,拆除两侧的模板;检查凝结后的钢筋混凝土层,并修补钢筋混凝土层。道路施工质量高,使用寿命长。
Garden road construction method
The invention provides a garden road construction method. The garden road construction method comprises the following steps: marking a to-be-poured area according to a planning size; cleaning the to-be-poured area, and reducing the pavement height of the to-be-poured area; building a reinforcing mesh in the to-be-poured area; erecting a plurality of formworks on the two sides of the to-be-poured area, sequentially arranging the formworks in the extending direction of the to-be-poured area, and pouring concrete between the formworks on the two sides to form a concrete reinforcing steel bar layer in the to-be-poured area; after the concrete reinforcing steel bar layer is condensed and stabilized, dismantling the formworks on the two sides; and checking the condensed reinforced concrete layer, and repairing the reinforced concrete layer. The road construction quality is high and the service life of the road is long.
本发明提供了一种园林道路施工方法,一种园林道路施工方法,施工方法包括如下步骤:依据规划尺寸标记待浇筑区域;清理待浇筑区域,并降低待浇筑区域的路面高度;在待浇筑区域搭建钢筋网;在待浇筑区域的两侧架设多个模板,多个模板沿待浇筑区域的延伸方向依次排布,在两侧的模板之间浇筑混凝土以使待浇筑区域形成混凝土钢筋层;待混凝土钢筋层凝结稳固后,拆除两侧的模板;检查凝结后的钢筋混凝土层,并修补钢筋混凝土层。道路施工质量高,使用寿命长。
Garden road construction method
一种园林道路施工方法
2020-04-17
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE