A platform for research: civil engineering, architecture and urbanism
Garden road construction method
The invention discloses a garden road construction method, and relates to the technical field of garden construction, in particular to a garden road construction method.The garden road construction method comprises a shell, an annular port is formed in the lower end of the shell, an inner rotating groove is formed in the side wall of the annular port, a first clamping mechanism is rotationally arranged in the inner rotating groove, and a reset mechanism is arranged between the first clamping mechanism and the shell. According to the garden road construction method, through repeated ramming and earthwork classified backfilling, improvement of the structural stability of the garden road is facilitated, and prolonging of the service life of the garden road is facilitated; and the tamping acting force of the tamping hammer mechanism can be adaptively increased along with the increase of the soil compaction degree in the tamping process, so that the construction efficiency is improved on the premise of ensuring that the follow-up construction quality is qualified.
本发明公开了园林道路施工方法,涉及园林施工技术领域,具体为园林道路施工方法,包括外壳,外壳的下端开设有环形端口,环形端口的侧壁开设有内转动槽,内转动槽中转动设置有第一卡合机构,第一卡合机构和外壳之间设置有复位机构。该园林道路施工方法,通过重复多次的打夯和土方分类回填,有利于增加园林道路的结构稳定性,有利于延长园林道路的使用寿命,该夯实装置通过设置第一卡合机构、第二卡合机构、夯实锤机构和惯性解锁机构,能够在打夯的过程中随着土壤压实度的增加,自适应的增加夯实锤机构的打夯作用力,从而在保证后续施工建设质量合格的前提下提高施工作业效率。
Garden road construction method
The invention discloses a garden road construction method, and relates to the technical field of garden construction, in particular to a garden road construction method.The garden road construction method comprises a shell, an annular port is formed in the lower end of the shell, an inner rotating groove is formed in the side wall of the annular port, a first clamping mechanism is rotationally arranged in the inner rotating groove, and a reset mechanism is arranged between the first clamping mechanism and the shell. According to the garden road construction method, through repeated ramming and earthwork classified backfilling, improvement of the structural stability of the garden road is facilitated, and prolonging of the service life of the garden road is facilitated; and the tamping acting force of the tamping hammer mechanism can be adaptively increased along with the increase of the soil compaction degree in the tamping process, so that the construction efficiency is improved on the premise of ensuring that the follow-up construction quality is qualified.
本发明公开了园林道路施工方法,涉及园林施工技术领域,具体为园林道路施工方法,包括外壳,外壳的下端开设有环形端口,环形端口的侧壁开设有内转动槽,内转动槽中转动设置有第一卡合机构,第一卡合机构和外壳之间设置有复位机构。该园林道路施工方法,通过重复多次的打夯和土方分类回填,有利于增加园林道路的结构稳定性,有利于延长园林道路的使用寿命,该夯实装置通过设置第一卡合机构、第二卡合机构、夯实锤机构和惯性解锁机构,能够在打夯的过程中随着土壤压实度的增加,自适应的增加夯实锤机构的打夯作用力,从而在保证后续施工建设质量合格的前提下提高施工作业效率。
Garden road construction method
园林道路施工方法
LI MING (author) / ZHANG KAI (author) / WANG WEIMING (author) / XU NAPING (author) / LIU MEI (author)
2024-05-03
Patent
Electronic Resource
Chinese